P  R  O  J  E  C  T  S
Berben Express Warehouse Building – Hadýmköy

The Warehouse facilites,
with a total open area of 35.000 m2,
and closed area of 10.000 m2,
shall be delivered on August 2000,
within 10 months of construction period.
The construction of the R/C structure
is completed by using industrial
formwork sets and fair faced
concrete surfaces are obtained.

Projects About Kayý Construction Homepage