Hydro-Electric Power Plant, Serhat
Completion Date: December 2015
Location: GİRESUN / TURKEY
Total Construction Area: 9.1 MW
Client: Kayen Omikron Energy Production

Serhat HEPP is located Dereli, Giresun and the installed capacity is 9.1 MW. The HEPP consists of a diversion weir, a 1420-meter water transmission tunnel, a head pond, 600 meter penstock and a power house. The plant has started its operation in December 2015. On the social and environmental basis, the project is renewable HEPP with its tunnel-type structure. KAYI Construction is the investor, developer, contractor and the operator of the Serhat Hydro-Electric Power Plant and the plant is expected to generate 25.04 GWh per year.