TURKEY
Hydro-Electric Power Plants
Completion Date: September 2014 (Büyükbahçe HEPP)
September 2014 (Bağbaşı HEPP)
Location: ERZURUM / TURKEY
Total Construction Area: 12.1 MW (Büyükbahçe HEPP)
14 MW (Bağbaşı HEPP)
Client: Kayen Beta Electricity Production Inc
Kayen Heta Energy Production Inc

Büyükbahçe and Bağbaşı HEPP’s are consecutive projects located in Tortum, Erzurum with the installed capacity of 12.1 MW and 14 MW each. These projects were executed together and in total both HEPP’s have 2 diversion weirs, 4 km pressurized water transmission line, 17 km water transmission line, 2 head ponds, 2 power houses and a 2 km water transmission tunnel. Despite difficult climate and working conditions, KAYI Construction successfully completed the EPC turn key construction in 2014. KAYI Construction is the investor, developer, contractor and the operator of the Büyükbahçe and Bağbaşı HEPP’s and the plants are expected to generate 33.08 GWh and 37.16 GWh per year.